Monday, 7 June 2010

Its Taking Shape

The building work to convert the surgery house into a new dental practice is approximately at the halfway mark.
It is all hands on deck as the installtion work continues; plumbing and electrics are coming along well with the air conditioning ducting traversing the roof spaces like some outlandish multi-limbed beast.
 
aircon electrics installation
aircon electrics installation

   

lights
Light Points and Reception Room?!
 


are these pipes right?
Are these pipes right?
 If I'm not drilling teeth at the moment I seem to be sourcing materials, going over floor plans or having site meetings to ensure that everything is just right and that there will be adequate lighting and power sockets. The most important phase (for me anyway) was deciding exactly where the dental chairs should sit. After much head scratching and measuring followed by remeasuring the final position of the dental units was agreed upon and the boys got busy laying the pipework that holds all the clever gizmos that allow the chars to move and operate. It's complicated stuff and there is no changing my mind once the concrete goes down so I hope I've worked out the dimensions of the rooms correctly!

concrete truck
"Concrete Truck's here"


 

pouring concrete
Pouring Concrete
 










The next day the concrete trucks arrived to pour the footings and slab for the treatment rooms and carpark. The concreting team swarm over the freshly pumped mix, tapping, prodding and smoothing until it is just right.The slab looks funny with all the plumbing work sticking out the top and again I get that hmm do you think the rooms are big enough feelng.   

smooth
Smooth

the slab
The Slab

framed surgery rooms
Framed Surgery Rooms

The concrete is barely dry and before you know it the timber frame work is up and ta da there are two surgeries. Yes they are a long way off being the finished product but after dealing with Council for so long this is massive leap forward. 



No comments:

Post a Comment