It is all hands on deck as the installtion work continues; plumbing and electrics are coming along well with the air conditioning ducting traversing the roof spaces like some outlandish multi-limbed beast.
| aircon electrics installation |
| Light Points and Reception Room?! |
| Are these pipes right? |
| "Concrete Truck's here" |
| Pouring Concrete |
The next day the concrete trucks arrived to pour the footings and slab for the treatment rooms and carpark. The concreting team swarm over the freshly pumped mix, tapping, prodding and smoothing until it is just right.The slab looks funny with all the plumbing work sticking out the top and again I get that hmm do you think the rooms are big enough feelng.
| Smooth |
| The Slab |
| Framed Surgery Rooms |
The concrete is barely dry and before you know it the timber frame work is up and ta da there are two surgeries. Yes they are a long way off being the finished product but after dealing with Council for so long this is massive leap forward.
No comments: